168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Green roof for 2 family residence filed in conjunction with alt2 421699576
replace existing roof top unit.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Repair/replace facade to include masonry, pointing, lintels, sills, scrape steel stairs and fire escapes, painting and caulking. Replace railings, terracotta stones, roof membrane…
Herewith filing for modifications to the existing mechanical system on the roof as per plans. no change to use, occupancy or egress under this application.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of roof protection as per plans. no change in use occupancy or egress under this application.
Proposed private roof deck.
Mechanical Work Associated with the renovation of Article 31 Medical Office Space. Work to install (9) VAV Boxes and (2) Rooftop Exhaust fans, and associated ductwork. No change in…
Mechanical modifications taking place on Cellar, 1st thru 4th floors, Roof as per plans filed herewith. No change in use, egress or occupancy.
Sprinkler modifications on floors 7, 8 and roof associated with new elevator installation and new elevator vestibule work on roof as per plans filed herewith. No changes in use, eg…
3rd floor low roof structural support for mechanical equipment installation. modify and reinforce the existing 4th floor low roof structure to accommodatea new opening for mechanic…
Replacement of rooftop air conditioning unit on existing steel dunnage. All existing ductwork to remain. No change in use egress and occupancy.
Hoist installation for roof repairs, no change in use, egress, or occupancy.
Direct replacement of two rooftop HVAC units
Propose subsequent structural work as per plan, filed in conjunction with alt-co# b01033960. scope of work includes new 2nd floor level, new passenger elevator, roof modifications.
To resolve ecb violation #35691035n, #35691036p, and #35691037r by legalizing partition walls and doors with general construction work on second floor. to install new split ac unit…
Installation of suspended scaffold & material hoist for exterior restoration, roofing replacement & inspections. suspended scaffold & mat. hoist shall comply with chapter 33 of the…
Roof covering replacement as per plans filed herewith. no change in use, egress or occupancy.
Installation of suspended scaffold & material hoist for exterior restoration, roofing replacement & inspections. suspended scaffold & mat. hoist shall comply with chapter 33 of the…
Filing herewith plans and applications for proposed ice cream parlor in existing commercial space. 2 new condensers with split units to be installed on the roof. pl filed under x01…