2,095 permits · Demolition · NY
Demolition of existing non-load bearing partitions w/in apartment 20g
Proposed temporary construction for the demolition of the existing structure and the new construction.
Convert 3 family apartment building to 2 family house. Demolition in rear yard and rebuild as stepped 2 level addition. Construct 3-level winder stair and new bulkhead for room access. Replace windows...
Interior demolition of non structural partitions and interior renovation of existing apartment h-206 on 2nd floor no change in use egress or occupancy
Interior renovation @ 2nd fl apartment, work to partitions demolition, new partitions, replace floor and interior finishes throughout only. no change in use egress, or occupancy..
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on Part of 16th Floor. No Change to Occupancy, Use or Egress is Proposed
Full Demolition of a 1-story wood framed structure
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
FILING FOR DEMOLITION OF METAL STAIR FROM 22nd TO 23rd FLOOR. INFILL OF EXISTING SLAB OPENING ON 23rd FLOOR WITH NEW SLAB CONSTRUCTION SUPPORTED BY STEEL BEAMS.
Full demolition of 2 story w/ cellar masonry building. all as per plans.
Interior renovation and combination of existing apt. 4A and 4BB. Work to include non-structural demolition, general construction, and finishes. apartment combined in compliance with TPPN 3/97. No chan...
Interior renovation consisting of demolition and construction of non-load bearing partitions & lighting. No change in use, egress or occupancy.
Minor demolition of existing partitions. new finishes and cabinets. no change to use, egress or occupancy.
Full demolition to a two story house
interior demolition of non-bearing partitions in the existing doctors' office.
Hand demo of 2 story detached house, 28' high
Minor Demolition of the mechanical system on the Cellar, 1-5 Floors as per plans. No change to use, egress or occupancy
Hand demo of a 2 story detached residence, 28' high
Install Temporary Construction Fence as per plans filed. Filed in conjunction with DOB NOW ALTCO Application #Q01175010-I1 and DOB NOW Partial Demolition Application #Q01145824-I1.
Partial demolition work in coordination with proposed Alt Co as per plans filed.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com