Search Building Permits
2,850 permits · HVAC · NY
Decouple existing hot water system from steam boiler and replace it with new natural-gas-fired condensing water heaters
Cap and remove existing one oil boiler and oil tank in cellar and install 16 gas boilers and 16 gas hot water heaters for existing 16 apts. existing use16 apt co# B55519 . No change in use occupancy o...
R041, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide heat during heating season. no change in use, egress or occupancy...
Northwell Lenox Hill Biplane Project: modify HVAC system to conform with new layouts as per plans filed herewith.
Installation of steam and condensate piping to two temporary boilers as per plans filed herewith.
Filing for plumbing work type in conjuction with application# b01370287-i1. adding new gas meter for boiler approximately 60 feet of pipe. no change in use egress or occupancy.
2 Boiler installation in conjunction with Alteration
Install hvac system for 2nd-4th floor for the building in subsequent with job#b01146694, in order to remove ecb violation#39129793j. no change in use, egress and occupancy.
Cap and remove existing one oil boiler and oil tank in cellar and install 16 gas boilers and 16 gas hot water heaters for existing 16 apts. existing use16 apt co# B55519 . No change in use occupancy o...
Interior renovation of 10th floor apt., work includes removal of non load bearing partitions, new partition layout, new finishes, millwork, flooring; lighting and painting throughout, no change to win...
Proposed hvac improvements as per plans. no change to use, egress or occupancy
Decouple existing hot water system from steam boiler and replace it with new natural-gas-fired condensing water heaters
Application to remove and replace (1) 550 gal. underground fuel storage tank with (1) new 250 gal. aboveground fuel storage tank. (No change in use, egress, or occupancy)
Installation of new boilers at the boiler pod. no changes to use, egress, or occupancy.
Modifications to existing Mechanical/HVAC System and ductwork related to Guestrooms renovation.
install 16 gas boilers in the cellar existing boiler room. no change in use, occupancy or egress. existing co #B55519
Mechanical work in conjunction with renovation of 3-story nycha multiple dwelling throughout: provide new hvac system from the cellar to a new prefrabicated heating boiler pod; no changes to use, egre...
Filing for the direct replacement of the existing HVAC, condenser, and air handler inkind. No change in use, egress,s or occupancy.
Renovation of existing one family house as per plans submitted. new hvac split unit will be installed. new dormer to be installed. also filed to cure the violations 39160539j, 39160540r, 39160541z. no...
Mech work related to renovation of existing commercial space Installation 8 ton split HVAC units with ductwork & 1 bathroom exhaust fans & ductwork