5,429 permits · Roofing · NY
Install solar pv on existing rooftop. no change in use, occupancy, or egress.
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Partial removal of structural slabs and framing at 15th, 16th, and roof levels. partial removal of non-load bearing masonry wall at 16th floor all as shown on drawings. filed in conjunction with struc...
Mechanical work on 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Replacement of hvac system on floor 002 and roof with a total capacity of 7 tons. no change to egress, use, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of temporary roof protection and overhead protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this ap...
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoist...
Propose interior renovation on cellar, roof. 1st thur 2nd floor. plumbing & gas works as per plan. no change in use, bulk, egress or occupancy.
P.S. 244-q: Replacing Gas fired roof top HVAC units with roof top Electric Heat pump HVAC units.
Installation of roof mounted pv solar energy system. No change of use, egress, or occupancy.
Install new domestic water, booster pump, hot water heaters, lab waste system, gas service; reroute sanitary piping. Provide new wet/dry/pre-action sprinkler systems and modify existing systems for ba...
Proposed roof replacement as per plans submitted herewith. there is no change in use, egress or occupancy.
Filed for mechanical designs on 1st floor and roof, including commerical kitchen rangehood exhaust system for golden beach deli. no change to egress, use oroccupancy.
Mechanical modifications taking place at cellar, 1st, 2nd, and roof as per plans filed herewith. no change in use, egress, or occupancy.
New eating and drinking establishment. New non load-bearing partitions, int. finishes, soundproof ceiling, storefront framing. New mech & air conditioning/venting. New type 1 hood for kitchen on 1st f...
Herewith filing to provide relocated and new roof drains and piping at this existing garage roof in conjunction with dob now structural garage repairs application B01300073-I1. No change to use, occup...