168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Q063- replacement of roofing systems, bulkhead exterior doors, windows & window guards. masonry repairs & interior repairs.
File boiler work type. install new boilers at roof. general construction work was filed under dobnow job#b08027258-i1.
Installation of a temporarily supported scaffold, sidewalk shed, needle beam, fence roof and overhead protection per plan submitted. Work shall comply with 2022 building codes chap…
Filing for the outdoor integrated 150 gallon sub-base tank, manufactured by Pryco Inc., model #: PY150ULDW for the generator only next to 2nd floor roof.
Remove/replace roof membrane and associated roof flashing, install roof pavers, concrete patching, and concrete deck crack repair.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Removal of mechanical duct work, kitchen hood and related kitchen exhaust on the 40th floor and roof as indicated on drawings.
Structural/framing plans with renovation, partial demolition and roof dunnage support
Replace/reconstruct roof of existing front one story as per plans. no change to use egress or occupancy.
Installation of a 100 KW Diesel Rooftop Generator.
No change in use, egress and occupancy. application herewith to propose new steel beams on roof to support new condensers. partial repairs to partition walls as required. resolve s…
Installation of pipe scaffolding and roof protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this ap…
Roofing replacement, exterior masonry and parapet repairs, flood elimination in cellar
Installation of 300 psf sidewalk shed, pipe scaffold, overhead protection and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change…
Q180 - filing herewith for the mechanical work related to the exterior masonry, parapets and roof replacement of the existing school. there will be no change in egress, occupancy o…
New Mechanical unit for the second floor to MDF room and roof top unit to service that AC unit and 2 electric unit heaters in the cellar , as per plans.
Structural work for roof pergola and deck as per plans. no change of use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed during roof and facade restoration (DOB Now # X01079962) per plan submitted. Work shall comply with 2022 building codes chapter 3…
Interior renovations at cellar & 1st fl to renovate the existing deli and bakery. enlarge 1st fl bathroom, new cellar bathroom, replace existing commercial hoods & exhaust fan; rel…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Modification to existing Verizon site. Remove 6 antennas, install 6 antennas, replace 4 RRH units, and remove platform with all related cabinets and equipment on roof. All in confo…