168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Kitchen and bath updates in place; fixture flooring and tile replacement. Tankless water heater install with venting/electrical AC plenum replacement
ePlan: Commercial Expedited Review - [APPROVED] New Construction of Exterior Pad for 6RFID and Light Pole Foundation.
Homebuilders loop for New SFR ref 2026-061236 BP. Austin LTD -PEC
Replacing MEP-ELE-PMT23-33310618
ePlan: Commercial Expedited Review - [APPROVED] New Construction of Canopy E with EV Chargers
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replacing MEP-ELE-PMT22-33302398
Replacing MEP-ELE-PMT23-33302631
Replacement of an existing water heater We are swapping out the old electric tank water heater for a similar model.
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [4bed 3bath]. Unit B
ePlan: Commercial Expedited Review - [APPROVED] New Construction Prefab Storage Shed.
ePlan: Commercial Expedited Review - [APPROVED] New Construction Prefab Storage Shed.
TEMPORARY BUILDING PERMIT scope of permit is limited to new foundation for ATR-34 with electrical and plumbing in slab (no buildings open air water at
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 12 disconnect
Replacing MEP-ELE-PMT24-33312050
Elec
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 16 disconnect
Remove 0ld disconnect federal pacific and install new only replacing the panel no meter work will be done just trying to bring to code. 8 disconnects
ePlan: Commercial Expedited Review - [APPROVED] New Construction of Exterior Pad
222 Belfast
Denali 26 laucks dan