13,622 permits · HVAC
Addition and/or Alterations - Mechanical / Fuel Gas Permit for combo RP-2025-005560
Hvac as per plan
Replacing the HVAC Units.
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
Application filed for mechanical modification, exhaust fan, Split system air conditioning unit
Install (5) ductless hvac split systems and (1) ducted heat pump split systems
Mechanical work filed in conjunction with new garage constructed under 321197432
SB 4th Fl:: Modifications of HVAC equipment and ductwork to accommodate alterations within the existing building as per plans filed herewith only.
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Mechanical work associated with conversion of building into daycare facility
Mechanical Work as shown on plans. No change to use, egress or occupancy.
File to remove and cap existing boiler and install 2 new tankless water heaters with existing gas valve with neutraliziing kit, drain and trap. no change in use, egress, or occupancy.
Replace oil burner on exisitng boiler.
Mechanical work on the 10th floor (Ramboll) as indicated on drawings.
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
Replace boiler and hot water heater and install two new boilers and one new hot water heater. no change in use, egress or occupancy.
Install of temp platform, LED screen, scenic walls, no alt to exist structures for Paramount Upfront. A TPA is required. Producer is responsible to monitor site safety. All production equipment remove...
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com