168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing herewith application for mechanical systems modifications as per plans submitted.
Install of temp wrestling ring, platform, no alt to exist structures for Sukeban Wrestling. A TPA is required. Producer is responsible to monitor site safety. All production equipm…
Proposed rear and front additions. interior /exterior renovation of one family to include partition changes, new kitchen, batrooms and new interior/exterior finishes.
Temporary overhead protection during bldg alteration, filed sep. overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applic…
Install new split heat pump system. no change in use, egress, or occupancy under this filing.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior renovation and mechanical hood of for commercial kitchen at basement floor #c2 as per plan filed herewith. no change in use, egress or occupancy.
Mechanical specifications filed in conjunction with gc application x01271675-i1
Installation of new hvac & erv systems for the heating, cooling, and ventilation of each dwelling unit in the building
Legalize three (3) hvac split units at exposure #3 for one (1) air handler and two (2) refrigeration units. no existing building materials to be disturbed under this application. n…
West retail - tenant a - modification to existing hvac system. no change in use, egress or occupancy.
Modification to HVAC system as per plans filed. No change in use, egress or occupany
Fire restoration of existing singlefamily home (cel,1-2) including all architectural finishes,power & lighting, kitchen & bathrooms,new staircase & front porch. no change in use or…
Temporary monorail system as per drawings. monorail system shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. suspended scaffold…
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Mechanical modifications and associated duct piping work (adidas - space 3011) as indicated on plans. no change in use, egress or occupancy.
Installation of new hvac and erv systems for the heating, cooling, and ventilation of each dwelling unit in the building.
Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy.
Installation of new hvac and erv systems for the heating, cooling, and ventilation of each dwelling unit in the building.
Installation of hvac rtu's, & kitchen exhaust ventilation system ( hood, duct & fan.) for popeye's & burger king restaurant.
West retail - tenant d - mechanical work as per plans. no change in use, egress or occupancy