Search Building Permits
2,850 permits · HVAC · NY
2 Boiler installation in conjunction with Alteration
Interior renovation of 10th floor apt., work includes removal of non load bearing partitions, new partition layout, new finishes, millwork, flooring; lighting and painting throughout, no change to win...
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Hvac filing for 2-family residential house
Hvac filing for 2-family residential house
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Proposed upgrades at Razran Hall, CUNY Queens College, for the existing 3-stop service elevator and machine room on the 1st floor. Upgrade includes interior finishes, Equipment, HVAC, and to comply wi...
Proposed upgrades to the elevators, encompassing interior finishes, equipment, HVAC systems, and addressing NYC Code deficiencies at three distinct locations within the CUNY Queens College Rosenthal B...
Hereby filing hvac system and related ductwork & piping per plans filed herewith. no change to use, egress or occupant
Application filed to install new mini split hvac units. all as per plans filed herewith.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Boiler work type to be filed in conjunction with alt2#301478719
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Subsequent filing for mechanical work in conjunction with the renovation of one family residence. New HVAC.
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Filing plumbing to supersede lla job#q01362740-i1 cap/remove (1) oil boiler w/ 250 gallon above-ground oil tank in cellar. register/replace (3) gas boilers & (3) gas hwh in cel and (3) gas stoves. no...
Boiler replacement in kind
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
Replacement of ductwork for existing HVAC units.
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.