9,542 permits · New Construction
12 Story mixed use new building
New construction of 2 story sfr with 4 beds 2.5 baths covered entry and opt covered patio and attached 22.53 car garage
Change of use to create a restaurant in existing unit new grease trap installation and interior remodel
New Construction - FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND PILOT HOUSE. STRUCTURE FOR USE AS FOUR (4) DWELLING UNITS. SPRINKLERED THROUGHOUT PER NFPA 13. SEPARATE PERMITS REQUIR...
New construction
New construction, addition, GFA change - For the erection of an attached structure with roof deck and roof deck access structure, size and location as shown in plan.
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
New construction, addition, GFA change - FOR THE ERECTION OF A NEW FOUR (4) STORY DETACHED BUILDING WITH CELLAR AND ROOF DECK (FOR RESIDENTIAL USE ONLY) ACCESSED BY TWO (2) ROOF ACCESS STRUCTURES (FOR...
New construction, addition, GFA change - FOR THE ERECTION OF A NEW ATTACHED STRUCTURE WITH CELLAR. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.
Erect
New construction, addition, GFA change - FOR THE REMOVAL OF AN EXISTING FREE-STANDING OUTDOOR NON-ACCESSORY SIGN (DOUBLE-SIDED, 20’ H X 60’ W) AND STRUCTURE; SIZE AND LOCATION AS SHOWN IN THE PLAN
site permit-4 of 4, fire department training facility, bldg #c1, c2, c3, c4, c5, c6, and c7, 7-story, type 2b.
6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct
construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work.
erect 12'x24' storage shed on sf golf course.
New Construction - FOR THE ERECTION OF AN ATTACHED TWO STORY BUILDING OF TYPE VB CONSTRUCTION FOR THE USE OF SINGLE FAMILY DWELLING (R3 OCCUPANCY). ENTIRE BUILDING TO BE FIRE SPRINKLERED PER NFPA 13D....
New Construction - FOR THE ERECTION OF AN ATTACHED STRUCTURE. STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SPRINKLERED THROUGHOUT PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR PLUMBING, MECHANIC...
New Construction - FOR THE ERECTION OF AN ATTACHED SINGLE FAMILY HOUSE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.
New Construction - FOR THE ERECTION OF A THREE (3) STORY STRUCTURE OF TYPE V-A CONSTRUCTION FOR USE AS ONE (1) VACANT COMMERCIAL SPACE (SEPARATE PERMITS REQUIRED PRIOR TO FIT-OUT AND ISSUANCE OF C.O.)...
New Construction - FOR THE ERECTION OF AN ATTACHED TWO-STORY STRUCTURE WITH ATTIC FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DO...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com