168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
EPLAN. - Proposed Swimming Pool and attached Spa per standard plan #268, with Automatic pool cover.- All work per soils report.
Supplemental to permit 23014-10000-02198 to repair existing foundation wall per site conditions. no additional habitable space permitted under this permit
Ch1A - ePlan: Interior alteration to existing joint live / work quarters to add new office spaces to work space area. Remodel existing restroom in work area, remove non load bearin…
Eplanchange of use from medical office (b occ.) space in business building to mussic school for student older than 18year old (b occ.)
Backfill the (e) pool - shell to remain
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Eplan: convert (e) 1st floor rec room(322 sq.ft.) and and 2nd floor laundry room(322 sq.ft.) to accessory dwelling units per gc 66323(a)(3); convert (e) garage space(266sq.ft.) to…
Eplan Grading for pool and spa work per soils report
Suppl. permit to 25047-20000-01631 to revise the pool enclosure.
New pool and spa per std. plan 268
Grading for backfill of trench around (e) religious pools within the building. related to work under 22016-10000-00676.
Supplemental permit to 25047-20000-01223 to revise the size of the spa.
Supplemental to 20047-10000-02226 to change of the location of the spa and details.
New pool, new spa per std plan#268 and engr details
Supplemental ref to pcis # 26047-30000-00286, to revise pool enclosure.
voluntary partial seismic upgrade at crawspace & accessible level 1 area, floor diaphram stengthening, 1 replace window (rear), 1 new window at level 1 (rear), foundation vents, re…
g/f: new retail space- demo. new awning floor refinishes, ceiling work, restroom alteration.
partial garage conversion to habitable space with bedroom and sitting area, office and bathroom. maintain 20' deep garage. construct new deck off the primary bedroom on the main fl…
commercial tenant improvement on 20th fl to secure 1 office space. includes demo and construction of non structural partitons and furniture. minor update to ceilings and finishes
unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, m…
****2025 wildfire inelegible project****new pool and spa per engineered design