168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior modifications including structural to 1st floor ceiling/2nd floor framing
Existing (alteration/addition)
Proposed temporary outriggers system installation for facade repairs. no change in use, egress, or occupancy.
Renovation of ground floor storefront. scope of work is limited to the ground floor facade. replacement of existing doors at front facade and rear yard work. no change to use, egre…
Scope: nonstructural interior kitchen remodel in unit 5402. locations: 1 residential unit(s), 0 non-residential unit(s), unit 5402-kitchen
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Self-cert 2019 cbrc: interior alteration and fire damage repair to existing 2 story 4 d.u. building. replace existing enclosed rear frame porch with new open wood frame porch same…
Fire alarm: repair existing system. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: no. special locking: yes. monitoring type: sup…
Interior renovation of the 2nd and 3rd floor.
Tuckpointing and unit masonry repair / replacement: 1000 sq. ft., lintel qty. 0, max. length 0. location: tuckpointing front.
Scope: nonstructural interior work: repair front interior stairway (grade to 1st floor) per building violations dated 9-17-2025. locations: 0 residential unit(s), 0 non-residential…
SSB-02
Stauber-McHugh Kitchen & Bath Renovation
Robert Swift Reroof
508 Cleveland AVE Addition (RES)
Carrington park condo bldg 1000 shell repair
Carrington park condo bldg 1000 unit 1310 repair
Temporary power
Open Record Request
Side Walk Waiver