5,429 permits · Roofing · NY
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Necessary work to make safe the limited and partial roof structure membrane & related ceiling framing due to fire in existing apt. 6E shown on plans submitted. All other work types to be filed separat...
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of roof protection at neighboring roof (842 5th Ave) during work at 4 E 66 street, as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupan...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoist...
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoist...
K019@PS414K : Remove Sillcock and a yard drain; install 2 Trench Drains and 1 Areaway Drain; remove & replace Storm piping at the yard area, Crawl Space, Basement,1,2,3,4 Floors; Replace 15 Roof Drain...
Structural alterations including new footings to the cellar, 1st floor, and roof, as required for installation of a MRI machine related to architectural application filed under application M0048276.
Mechanical work on 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy.
Install solar pv on existing rooftop. no change in use, occupancy, or egress.
Structural alterations including new footings to the cellar, 1st floor, and roof, as required for installation of a MRI machine related to architectural application filed under application M0048276.
Proposed roof replacement as per plans submitted herewith. there is no change in use, egress or occupancy.
Replacement of hvac system on floor 002 and roof with a total capacity of 7 tons. no change to egress, use, or occupancy.
Installation of temporary roof protection and overhead protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this ap...
Mechanical modifications taking place at cellar, 1st, 2nd, and roof as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Propose interior renovation on cellar, roof. 1st thur 2nd floor. plumbing & gas works as per plan. no change in use, bulk, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com