14,262 permits matching "hvac"
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Replace boiler, h.w.h.,bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Application fo;ed here to propose mechanical system work type in conjunction with job #b01186289-i1
Mechanical work taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Mechanical demo and modifications on 10th floor. No change to use, egress, or occupancy.
Mechanical modifications to take place on the 9th construction floor as per plans filed herewith. No Change in use, egress, or occupancy.
install new whsp supporting heating and future tenant cooling and install hydronic heating system as per plans
Submit mechanical plan in conjunction with alt-1 application#m01109601-i1.
Supplemental permit to Complete work done under previously expired permit #18010-10000-02615. Work is 90% complete (Minimum 75% percent completed as determined by inspection). Including Mechanical, El...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no chan...
Replacement of complete existing central heat and air system with or without duct work
Application is filed for the installation of ductless replacement hvac units at first floor elevator machine roof and roof, as per plans submitted herewith. no change to use, egress or occupancy of bu...
STRUC/ELEC/PLMB/MECH - COMMERCIAL REMODEL - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL MISCELLANEOUS - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL MISCELLANEOUS - Building
ADD BATHROOM Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE A...