168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
File job for demolition of car garage @ rear yard.
Partial demolition and renovation at 232 east 32nd street.
Demolition of detached house. On-site and off-site fill not to exceed 300 cubic yards.
This legalization app is filed to show the demolition of select interior partitions on floors cellar through 15 that should have been included under interior demolition application…
Full demolition to a one story building
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior renovation & combination of coop apartments #11A & #11B. Work to include non-structural demolition, general constructions & related finishes, as per plans filed herewith.…
Interior renovation to apartment # 4G/N on the 4th Floor. Work include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or o…
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 18th Floor Suite 1801( Viabizzuno Ste) as per plans. No change to use,…
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st floor (Ares- Buildout) as per plans. No change to use, egress or occupancy.
Full demolition application of a 1 high story brick and steel with concrete building.
full demolition of fire damaged two story structure, under DOB & HPD Accelerated Emergency Declaration.
Proposed interior demolition and renovation of existing 2 story residential building. demolition work as per plan. no change in use, egress oroccupancy.
installation of construction fence to protect site, during full demolition
Demolition of sprinkler heads and installation of temporary loop as shown on plans. (Filing B)
Provide temporary shoring to locally demolish existing masonry pier from 1st floor down to basement. no change in use, egress or occupancy.
Interior non-structural demolition: removal of gwb wall, clg & wall finishes. no proposed change to use, egress or occupancy. no enlargement or development.
Interior alterations to include non-load bearing demolition. no change to use, occupancy or egress
Renovation the apartment #1c on 1st floor of existing 6 story building. demolition and construction work as per plan. no change in egress, use, or occupancy.
Interior non-structural demolition of existing office tenant fit-out. scope of work includes removal of existing non-load-bearing partitions, ceilings, finishes, and partial demo o…
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # b01358069. no change to use, egress or occupancy under this application.