Search Building Permits
2,850 permits · HVAC · NY
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Hvac filing for 2-family residential house
Boiler work type to be filed in conjunction with alt2#301478719
Filing herewith plans and application to install 2 pc bathroom ( lav, toilet ) and new laundry area ( 2 washer, 1 gas dryer ) (1 hwh & 1 heater ) on first floor. and replace wall mounted boiler on sec...
Installation of mechanical hood for existing kitchen. install new make air unit and new hvac equipment for ec 42. no change of use, egress or occupancy under this application
Subsequent filing for mechanical work in conjunction with the renovation of one family residence. New HVAC.
Hvac filing for 2-family residential house
Proposed upgrades to the elevators, encompassing interior finishes, equipment, HVAC systems, and addressing NYC Code deficiencies at three distinct locations within the CUNY Queens College Rosenthal B...
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab infill as per plans (D...
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
Proposed upgrades at Razran Hall, CUNY Queens College, for the existing 3-stop service elevator and machine room on the 1st floor. Upgrade includes interior finishes, Equipment, HVAC, and to comply wi...
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Hereby filing hvac system and related ductwork & piping per plans filed herewith. no change to use, egress or occupant
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Install (7) new boilers for existing 5-family dwelling and (1) commerical store in cellar as per plan. no change in use, egress or occupancyunder this application.
Hvac filing for 2-family residential house
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Application filed to install new mini split hvac units. all as per plans filed herewith.
Boiler replacement in kind
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.