168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: angel pazos
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: angel pazos
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: cesar quito
Filing application to address ecb violation # 35718093z, to perform structural repairs to existing one-story parking structure located at the cellar level. work includes the remedi…
Installation of suspended scaffold for facade inspection/repair.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed horizontal enlargement to an existing one family dwelling along with interior renovation. no change in use occupancy or height is proposed
Interior renovation of apartment 35f. partition changes tonon-load-bearing walls as per plans. no change in use,occupancy or egress.
Interior Renovation as per plans, no change in uses, occupancy and bulk.
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: jaroslaw jablons…
Removal of interior non-loadbearing partitions, finishes, fixtures, and capping as shown on the drawings filed herewith. No change in use, egress, or occupancy.
legalization of work done without permit for vertical/horizontal enlargement and for proposed rear deck and balcony ,new WINDOWS in existing 1 family house
Combination apt 1 with cellar. renovation. no change of use, egress or occupancy.
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: cesar quito
Interior work on the 1st floor filed in conjunction with mep as per plans. no change to use, occupancy or egress.
Interior/exterior wall repair as per plans. creation of a temporary opening in the front facade to facilitate movement of excavation equipment to the rear yard. the excavation equi…
Temporary installation of adjustable suspended scaffold for facade inspection & repair. no change in use, egress, or occupancy. designated primary site supervisor: angel pazos
Structural work for existing fire escape repairs at south 2nd floor landing and west 2nd and 3rd floor landing as needed.
Hereby filing for the renovation of unit 51. no change in use, egress or occupancy.
Interior renovation of existing restaurant on partial cellar and partial 1st floor. proposed general construction work as per plan filed herewith. no change in use, occupancy and e…
Install exterior non-illuminated wall sign (regal)