168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Q081: roof replacement, remove & rebuild parapet walls, repair masonry, remove & replace windows, reclad bulkhead enclosure, relocate roof fan, rebuild interior shaft, repair/repla…
Q081: roof replacement, remove & rebuild parapet walls, repair masonry, remove & replace windows, reclad bulkhead enclosure, relocate roof fan, rebuild interior shaft, repair/repla…
Masonry restoration, waterproofing installation, window sill replacement and parapet rebuilding at exterior envelope as per plans filed herewith. no change in use egress or occupan…
Structural work includes removal of existing roof mounted concrete piers supporting current mechanical equipment, installation of structural steel dunnage framing, including but no…
Application being filed to provide roof protection and protection methods.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Filing for repairs to the facades and roof stair bulkheads. No change to use, occupancy or egress.
Subsequent filing for structural work type. propose new stair to roof and bulkhead; new skylights; new rear deck and alteration to existing floor framing as per plan.
Herewith filing removal and replacement of existing package rooftop unit. no change in use, egress or occupancy
Installation of a temporary roof protection via scaffold with netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ…
Installation of a temporarily supported scaffold, sidewalk shed, needle beam, fence roof and overhead protection per plan submitted. Work shall comply with 2022 building codes chap…
Scope of work includes demolition of interior partitions at cellar through 4th floor and roof as indicated on plans. no change in use, occupancy or egress.
Installation of Paint Spray Booth & Mixing Room, Duct work from units up to roof for Exhaust, Installation of Dry Chem fire suppression. No change to CO, Egress, or Occupancy.
Renovation of apt. 24 on 6th fl. new bulkhead with an accessory stair to a new roof deck for apt. 24. partition work per plans. new electric a/c system. no change in use, egress or…
Installation of temporary roof protection as per plans during general construction work. no change in use, egress or occupancy. roof protection shall comply with chapter 33 of nyc…
Temporary roof protection as per drawings. roof/window protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of direct replacement of existing residential HVAC condenser unit on roof for unit 7C. Certificate of compliance is required prior to sign-off.
Interior alterations and modifications to tenant floors 21-24 and to the 24th floor solarium storefront & roof.
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing . No change in use, egress…
Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
Acacia Cluster - Existing 3-Story Residential Building. Propose roof replacement and ordinary repairs for exterior walls, common area, kitchen & bathrooms as per plan. No change in…