3,934 permits · Demolition
Eplan- demolish exiting single family dwelling with attached garage and accessory living quarters.
Interior demolition of existing non-bearing gyp. bd. partitions. Installation of new non-bearing partitions, door, frames and finishes. No change in use, occupancy or egress
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings for pits, new steel be...
Demolition - Interior
Demolition - Interior
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.
Temporary construction fence for the full demolition of 207-04 garage 104 avenue
Interior demolition on existing two (2)-family, two (2) story brick residential building with basementand cellar.no change of building bulk, occupancy or egress
Hand demolition of existing one story frame garage
Interior non-structural demolition of 1st and 2nd floors, including removal of non-load bearing partitions, finishes, doors, storefront elements at eating and drinking establishment, as per the archit...
Proposed demolition of 1-1/2 garage.
Mechanical Demolition of Comfort Station Building in East River Park as part of the East Side Coastal Resiliency (ESCR) project.
4 - Alteration
Interior demolition of existing mechanical systems as shown on filed plans.
General construction work related to the demolition of existing interior partitions. Installation of new furred out layer of gyp. bd. on existing partitions. Repair of existing partitions. No change i...
THIS IS A FULL DEMOLITION OF 1 STORY FRAME HOUSE. FENCE FILED UNDER SEPARATE APPLICATION. ENTIRE FOUNDATION BELOW GRAD IS TO REMAIN IN PLACE (as per 3303.13.3) AND ADDRESSED IN SOE PLANS OF HERE AFTER...
First phase preparatory interior demolition of non bearing walls. No work to VCT or Mastic.
Full demolition to a one story building
Replacement of existing gas dryers in existing laundry room. minor non-structural demolition of interior partition walls. no change in use, egress, or occupancy.
Interior demolition of existing non-load bearing walls and finishes as per plans submitted herewith. there is no change in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com