168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary personnel hoist, rack & pinion, 8000lbs capacity @ 275fpm, 25 floors, pursuant to plans submitted and subject to city of chicago dept. of buildings elevat…
Spr 2019 cbrc: replace existing front open porch with same size and location.
Full rebuild (same as existing) for wood porch (open) (quantity: 1, location: rear of building).
In-kind replacement of exterior windows and doors in existing openings. replacement windows: 8; replacement skylights: 0; replacement doors: 4. affects: 1 residential unit(s), 0 no…
Wrfeck and remove a 1 story masonry commerical garage including footings and foundations
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Channel letters to read auto parts
Moderdnization to include replacement of cylinders for two(2) 2000lb capacity, 5-floor, 100fpm, passenger elevators, pursuant to the scope of work submitted.(ev005321)
Installation of led illuminated logo on wall
Installation of channel letters on wall
2019 cbrc structural peer review: replacement of (2) exterior west steel stairs with (1) new 2-story steel stair and replacement of (2) exterior east steel stairs with (1) new 1-st…
Wreck and remove a 2 story frame residence and a detached frame garage
For permit 101074862: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Spr 2019 cbrc: tenant buildout of 2414 sqft on ground floor & 537 sqft in basement for dental offices in mixed use building per plans**certified corrections subject to field inspec…
Spr 2019 cbrc: erection of new 20.50' w x 22.76' l masonry garage per plans. to reconcile existing garage built without permit.
Fire alarm: modification of existing system. associated building permit:101076603. affects: 0 dwelling units; 1 non-residential units. high-rise building: no. voice communication:…
Temporary scaffolding: qty: 2, max. length: 30 ft., max. height: 330 ft. location: all elevations. permit expiration date: 365 days from permit issued date
Permit expires on 06/24/2026 erection starts: 5/16/2026, erection ends: 5/16/2026. columbia college manifest 2026mobile stage - 1 day event may 16, 2026 erect two (2) mobile stages…
For permit 101078358: replacement general contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Self-cert 2019 cbc: full building permit for 2 story 2 d.u. building with basement, rear deck with stair at 1st story, detached 2 car garage as per plan (occupancy group r-5, type…
Full rebuild (same as existing) for wood porch (open) (quantity: 1, location: front of building). landing: 120 square feet. landing not more than 6 feet above ground.