168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed temporary one (1) story structure for community facility use.
Install 8' temporary construction fence at the above address
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Proposed support of excavation work filing #b01080774-s4 in conjunction with g/c filing#b01080774-i1
File pl & sp worktype in conjunction with job#
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of a heavy duty sidewalk shed to include storage.
Structural modifications for the support of new stairs and new floor openings
Filing herewith to convert floors 2 ,3 and 4 floors to R-1 occupancy to include hotel rooms and the creation of a mezzanine platform level for the Residence Inn Hotel. There is no…
Install illuminated double faced pylon sign. (animal medical center - 24 hour emergency services) structure to be filed under seperate application
Installation of 395' new sidewalk shed at 77 new york avenue, as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Fn/nycha eastchester houses bldg #9 submitting on behalf of contractor for the installation of temporary construction equipment (fence) to protect public from work areas .no change…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Herewith filing for structural modification work of the building as per plans. no change to use, egress or occupancy under this application.
A.remove existing retaining wall. b.remove existing soil retained by the retaining wall. c.re-grade front and side yard .e.built a concrete pad on the front and side yards. f.no ch…
Resolve ecb violation: 39132866z; remove fiber glass awning enclosure and sign at storefront restore to prior legal condition as per plan. no change in use, egress or occupancy und…
Installation of temporary construction fence
Proposed underpinning work filing #b01080774-s5 in conjunction with g/c filing#b01080774-i1