11,038 permits · Renovation · NY
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Jose Chauca
Application filed for sprinkler additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler work during interior demo and white box construction on 9th floor
Minor interior work @ cellar only to resolve oath/ ecb violations# 39170911x & 39170910y. install a new garage door and new partitions as per plan. no change in use, occupancy and egress.
Renovate exist lobby & install new marquee/portico by OSP lobby entrance area within property line. New furring walls, flooring, ceiling. replace exist exterior stucco wall area by entrance.. Energy c...
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
Demo 1 bathroom, kitchen cabinets, walls at noted locations, new flooring, ceiling, new walls at noted locations. apt being changed from a 2 to 3 bedroom. no change in use, occupancy or means of egres...
Scope of work includes existing kitchen cabinet removal; new partitions, doors, headers, stair & railing addition. no change to floor area,, bldg occ, use, zoning bulk or egress.
Proposed support of excavation for four story addition and utilities including detention system.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Bmh cch: facade repair as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Enmanuel Martinez Ortiz
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Darius Janczak
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
Bmh main campus: facade repair, including brick repointing, lintel repair and window replacement as per plans filed herewith. no change to zoning, use, egress, or occupancy.
Renovation of existing cellar, 1st, 2nd floor and attic with general construction: new partitions, doors, flooring and cosmetic work; no change in use, egress or occupancy under this application.
Application filed for interior alterations throughout existing 2 family, 2 story building with cellar. No change to egress, use, occupancy
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com