5,433 permits · Roofing · NY
New exterior frame walls from 1st floor ceiling up to the underside of the 2nd floor soffit (no increase in floor area or osp) create new attic floor and new pitched roof.
Propose interior renovation on cellar, roof. 1st thur 2nd floor. plumbing & gas works as per plan. no change in use, bulk, egress or occupancy.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Replace sump pump, hoist...
Installation of solar panels, rooftop, grid tied, railed, 20 modules, 8.8 KW
Nyu langone - brooklyn augustana 3rd fl rehab - modifications to existing floors, partitions, ceiling and doors as per plans. scope includes modifications to allow for new connections to equipment on...
Direct replacement of rooftop unit
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress or occupancy under t...
Nyu langone - brooklyn augustana 3rd floor rehab - structural modifications including new dunnage to allow for new mechanical equipment on roof. no changes in use, egress, or occupancy.
Propose facade repairs. Scope of application to include: Brick, Sill, Lintel replacements, Mortar Repointing, and shelf angle replacement with waterproofing.
Installation of photovoltaic solar array on existing roof system as per plans
Mechanical work filed in conjunction with renovation of existing apartment ph12 on the 12th floor. install hvac units & associated ductwork. install new condensers on roof. install toilet, kitchen & l...
Replacement of roof top unit and associated duct/piping as per plans. no change to use, egress or occupancy.
Installation of roof protection for adjacent property during construction. roof protection shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Alt co application proposed horizontal & vertical existing to exisitng (1-1/2) story residence. increase in flr area from 2203.61 sf to 2457.76 sf. addition of full second flr & new roof.
8904-MH Installing Roof Top Mechanical Unit for future Tenant. No change in egress use group or occupancy group. Professional certification requested.
Alt co application proposed horizontal & vertical existing to exisitng (1-1/2) story residence. increase in flr area from 2203.61 sf to 2457.76 sf. addition of full second flr & new roof.
Modification of an existing Verizon site. Replace natural gas service from basement gas meter to generator replacement on roof filed under DOB application no. X00802727-I1. All work in conformance wit...
Roof structural work and roofing replacement.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com