168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
demo rear building at 4176 cesar chavez st. due to toxic mold.
Demolition of (e) machine shop building."comply with department order effective date 01/14/2025. permit will expire 30 days from issuance date".
Ti and change of use from retail to new massage parlor. services provided by state licensed massage therapist.demolition of non bearing walldas:summary of accessibiling upgrades pe…
Demo the (e) sfd and detached two car garage
selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Demo the (e) sfd.
Eplan. Demolish detached garage, pedestrian protection fence required
Demo the (e) sfd with attached garage.
*ePlan* Demolition of existing detached garage
Demolition of detached garage
***2025 wildfire*** Demolish existing sfd with attached garage
Eplan: Demolition of (E) 2-Story Apartment
Eplan: Demolition of (E) 2-Story Duplex
Demolish (E) 1-story SFD w/ attached garage
Eplan: Demolition of (E) 1-Story SFD with attached Garage
basement level: interior demolition and construction to create new mailroom and mpoe at basement. new lobby and relocation of trash room at 1st floor. mep under separate permit.
tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partition millwork and ceiong. mep under sep.
priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above ex…
29th floor: interior non-structural demolition on the 29th floor. ab017
level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing…