168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
new bath w/laundry. remove door to other bath. new water heater and furnance. remove interior plaster and drywall finishes. remove knob and tube wiring to upgrade panel( under sepa…
remove & replace (1) non-electric double faced blade panel sign:"lids"
install (n) electrical channel letters sign facing street single sided for "soma gift shop" called sign a.
install electrical channel letters facing street
Kitchen remodel (no structural changes combined with plumbing and electrical) "comply with department order effective date 05/14/2026. permit will expire 30 days from issuance date…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
top floor: remodel 2 bathrooms and kitchen in kind. upgrade electrical wires of the unit, and upgrade sub-panel.
interior remodel 2nd level only. no exterior changes, nonstructural work include. bath remodel: remove e shower, replace e tub, w/combo, nw bathroom layout & fixtures, nw finishes,…
new electrical throughout: new wire & fixtures. new sheetrock/insulation/tape. replace toilet & kitchen fixtures.
front: remodel (e) kitchen bathroom. new electrical & plumbing fixtures.
(2) electric single face wall sign, "fitness sf".
unit 6: (1) 70 sq.ft kitchen and (1) 35 sq.ft bathroom remodel, no change to wall, follow (e) layout. update electrical to code. new led light fixtures.
***2025 wildfire eo-1 eligible project***eplan. rebuild 2-story sfd with basement and attached two car garage , nfpa-13d fire sprinklers required throughout, all work per engineeri…
NEW 33'-6" X 35' 2-STORY SFD per SB9 Two-Unit Development Ca Govt Code 65852.21 WITH 2-CAR GARAGE. ALL WORK PER ENGINEERING. nfpa 13d fire sprinklers throughout.
New fully sprinklered all electric detached accessory dwelling unit per lamc 12.22 a.33(c) and (d)
****2025 wildfire rebuild eo8 eligible project****new irregular shaped 2-story sfd w/ 2-car garage. nfpa 13d fire sprinklers throughout. all work per engineering.
interior remodel - kitchen & bathroom renovation, laundry relocation, tankless water heater installation, window replacmeent and whole home electrical rewire. no structrual work pr…
bathroom remodel, kitchen remodel, electrical rework, drywall.
document the removal & replacement of the exterior deck boards for the living room deck tat was constructed per 9510677 & shown on sheets a2 & s1. work < 50%. no framing, foundatio…
minor interior remodel including renovation of bathroom to add 2nd full bath. addition and removal of partition walls, addition of washer dryer. addition of new window at lightwell…
**2025 wildfire eo-1 eligible project ** rebuild 4-story per zoning code, 3 stories + mezzanine loft per building code, 30 units apartments type v-a over type i-a existing basement…