168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Deck and exterior stairs. (jjl) ****deck is not attached to house and is not main egress. less than 30" above grade.**** building code: 2020 mnsbc/2018 irc energy code: minnesota r…
(dmh-pdox) frame & finish for new 1/2 bath in kitchen space of sfd. approved plans and permit must be on site before inspections will be provided. applicant is required to print co…
Food/Rough-in and install, sink,coffee, dishwasher, water for fridge, electric water heater
Install Water Heater (Electric)
Set, vent & hook installation of a Kozy Heat NDK-34i gas fireplace insert & venting into the main floor living room masonry fireplace. Hooking to gas & electrical run by others.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Unit 100/Replace electric water heater
Non-structural kitchen remodel in sfd. minor demo at wall/ceiling finishes as required for electrical work and exhaust vent install, minor framing to extend existing interior walls…
Kitchen Remodel. Replacing hot and cold feeds. New valves. Remove and replace sink, faucet, dishwasher, garbage disposal. Cap gas feed (switching from gas to electric stove)
19th floor #19S/2 new sinks, Electric water heater
Install new factory built gas fireplace with venting on main floor level of home. gas and electrical work done by others. heat n glo sl-5x-ift-g
Non-structural kitchen remodel building code: 2020 mn residential code/mn rules ch 1309 (2018 irc) energy code: 2015 mn residential energy code/mn rules ch 1322 construction docume…
Install structural supplement & groundwater collection and discharge engineer: 54808 - nevison, patrick richard building code: 2020 mnsbc/2018 irc energy code: minnesota rules chap…
(dmh-pdox) wall framing repairs to south side of detached garage to sfd. - 2020 mnsbc approved plans and permit must be on site before inspections will be provided. applicant is re…
New detached garage. portal frame. see figure 602.10.6.4 (jjl) construct detached _22__ by _22__ wood frame garage. garage retaining wall conditions: no construction documents: ele…
(dmh-pdox) remove and replace attic insulations and drywall finishes in sfd. approved plans and permit must be on site before inspections will be provided. applicant is required to…
#1010 install electric water heater in break room
Installing a new tankless electric water heater
Kitchen remodel. new windows. remodel most of level 1. (jjl) engineer: safe haven - derek phillips - 47507 building code: 2020 mnsbc/2018 irc energy code: minnesota rules chapter 1…
Replace electric water heater
Dormer to existing house with bathroom on 2nd floor. (jjl) engineer: safehaven - derek phillips #47507 building code: 2020 mnsbc/2018 irc energy code: minnesota rules chapter 1322…