Search Building Permits
6,807 permits · HVAC
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Repair gas lines and proposed ceiling mounted gas furnaces.
Construct tenant improvements in commercial building on fourth floor occupy per plan. Mechanical is included.
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
replace existing ducts with new layout on existing existing HVAC system on portion of the 10 floor in conjunction with Alt # M01349165 as per plans filed
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
New air conditioning and ventilation installation for apartment renovation in conjunction with GC #M01084668-I1. No change to use, egress, or occupancy. Post Approval Amendment filed to show changes t...
Replacement of brick masonry, replacement of steel lintels, replacement of 3-wythe parapets, replacement of thru wall air conditioner sleeves, and replacement of coping stone. No scope of work at the...
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
Repair gas lines and proposed ceiling mounted gas furnaces.
Replace existing gas boiler, hot water heater and dryer in the cellar. construct a new three-fixture bathroom in the cellar. replace existing residential stove on first floor and install new plumbing...
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Spr 2019 cbrc: revision to permit 101064832 to remove bakery from scope of work, including oven & hood. remove all walk-in coolers, leaving only standard reach-in coolers & freezers. all existing hvac...
Interior & exterior remodeling of the existing restaurant to a new restaurant including architectural, electrical, hvac and plumbing work.