Search Building Permits
2,840 permits · HVAC · NY
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
This application is filed for the installation of one (1) gas boiler in cellar
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Replace boiler and hot water heater and install two new boilers and one new hot water heater. no change in use, egress or occupancy.
Interior renovation of cellar basement and 1st floor of existing 2 story building. demolition and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 3-pc bathroom, boilers and hot water heaters in cellar; new yard drain at rear yard. no...
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
File to remove and cap existing boiler and install 2 new tankless water heaters with existing gas valve with neutraliziing kit, drain and trap. no change in use, egress, or occupancy.
Replacing the HVAC Units.
Replace oil burner on exisitng boiler.
Proposed installation of air conditioner system as per plan. no change in use, egress or occupancyunder this application.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Installation of variable refrigerant flow (vrf) hvac system serving apt 11-ef including minor partition work, new dropped ceilings and soffits to accomodate new lighting.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
This application is filed for the installation of one (1) gas boiler in cellar
Installation of one (1) new gas boiler in cellar