Search Building Permits
2,850 permits · HVAC · NY
Replace existing exhaust fans as mentioned on drawing M002.00. Replacement of HV units with AHUs as mentioned on drawing M002.00. Balance airflows in existing classrooms to match existing design CFM....
Installation of 36,000 BTU single zone HVAC system in LAN room. No change to occupancy, use or egress.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Install new boiler exhaust direct vent as per plans. no change in use, occupancy, or egress.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
New tenant fit-out for commercial space (pharmacy ug 6) at 1st floor (unit 104). work includes installation of non-bearing partitions for pharmacy area, restroom and hvac units as per plans herewith....
Install HVAC unit for chase bank.
modification & additions to existing 1st floor hvac systems and new cellar commercial cooling and hood exhaust systems as indicated on plans.
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER, DRYER, BOILERS AND HOT WATER HEATERS iN CELLAR; NO CHANGE IN USE...
Remove incinerator and cap existing flue. Install new flue lining in chimney. Remove existing thermostats throughout building and replace with new. Remove and replace ductwork, oil piping, vent piping...
Installation of 36,000 BTU single zone HVAC system in LAN room. No change to occupancy, use or egress.
Existing gas piping connecton to replacement boiler.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Install new boiler exhaust direct vent as per plans. no change in use, occupancy, or egress.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Scope of work includes the replacement of gas boilers and associated piping and ductwork.