A. cellar1. create storage room in the cellar as per plan.2. create 2 pcs powder room in the cellar.3. remove existing non load bearing partition wall in the cellar.b. 1st floor1.…
Installation of temporary construction fence for ps 175x at 200 city island avenue, bronx in conjunction with alt# x00838637 as indicated on plans.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Construction work on the 1st floor (GMSC) as indicated on drawings.
Reconstruction of front retaining wall
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary…
Sprinkler Standpipe work as shown on the plans.
test
Proposed installation of a temporary pipe scaffolding as per plans submitted. work shall comply with building code, chapter 33. no changes in use, egress or occupancy.
FANATICS FEST NYC 2026: Pinnacle Exhibits- Raising Cane's Booth #1973 to install a temporary exhibit within an existing exhibition building. Scheduled construction on July 13-20, 2…
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Propose a new accessory garage at rear yard. obtain new c of o.
General construction taking place on the 15th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of suspended scaffolding
Installation of new sidewalk shed at 1039 evergreen avenue, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Soldier piles with internal lateral bracing and stable soil berm for the proposed excavation and foundation work as per plans filed. no change in use egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.