168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New boiler room 2hr fire rated. new 3 approve polypropylene innoflue cat4 venting system up to roof. no change in means of egress use group or occupancy.
Register three (3) roof top hvac units.
facade and roof repairs as per plans filed herewith. no change to use, egress or occupancy.
Interior renovation erect minor wall partition & install kitchen equipment at the cellar / 1st. fl. / mezz, and the roof, mechanical work for exhaust hood in commercial kitchen in…
Filing for tenant-in-place roof replacement to include new roofinsulation, roof membrane and parapet extension. there will be no change in egress, use, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Selective parapet face brick replacement, repair and repointing. Selective face brick replacement on chimney. Selective roof replacement. Complete window replacement.
Exterior roof terrace renovation. installation of solar energy system & green roof. no change of use, egress or occupancy under this application.
Remove and replace/reinstall existing mechanical ductwork, piping and equipment associated with areaway reconstruction and sub-basement waterproofing. Providing temporary ductwork…
Removal & installation of non-load bearing partition walls, doors & windows, facade work, exterior railings, new roof deck as shown on plan set filed herewith. No change in use, eg…
VERTICAL EXTENSION AT SECOND LEVEL PARTIAL OF SECOND FLOOR AT REAR OF THE BUILDING: DEMO ROOF OF FIRST FLOOR. The height of the building remains the same even though it's a vertica…
Installation of 300 psf sidewalk shed, overhead protection, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no chan…
Replacement of 3 rooftop units with a total capacity of 30.5 tons. no change to egress, use, or occupancy.
Installation of split system on the 2nd floor and roof with a total capacity of 4 tons. no change to egress, use, or occupancy.
Replacement of roof membrane and roof insulation.
Herewith filing to restore a existing garage, with a new roof, doors,and exterior finish. no change in use, egress or occupancy
Temporary roof protection at the adjoining properties as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl…
Conversion of existing multi family dwelling to two family dwelling. add a stair bulkhead, roof terrace. facade work to modify windows and door openings at rear basement and 1stflo…
Hvac and ventilation work in unit #505 and roof; no change to use, egress or occupancy.
Remove and replace the roofing membrane and flashing within the existing grade level fountain
Proposed interior renovation on cellar, 1st thru. roof floor. ceiling, flooring & partition works and replace window and door as per plan. no change in use, bulk, egress or occupan…