5,433 permits · Roofing · NY
Alt co application proposed horizontal & vertical existing to exisitng (1-1/2) story residence. increase in flr area from 2203.61 sf to 2457.76 sf. addition of full second flr & new roof.
Alt co application proposed horizontal & vertical existing to exisitng (1-1/2) story residence. increase in flr area from 2203.61 sf to 2457.76 sf. addition of full second flr & new roof.
Alt co application proposed horizontal & vertical existing to exisitng (1-1/2) story residence. increase in flr area from 2203.61 sf to 2457.76 sf. addition of full second flr & new roof.
Mechanical work to renovation of unit# 2, 3, 4, 5, from 2nd floor to 5th floor and roof. no change to use, egress or occupancy
Installation of roof protection for adjacent property during construction. roof protection shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
This application is for alt type ii alteration of an existing building comprising a new fireproof fire passage at cellar & 1st fl with new interior & exterior stairs from rear yard leading to street;...
Nyu langone - brooklyn augustana 3rd fl rehab - modifications to existing floors, partitions, ceiling and doors as per plans. scope includes modifications to allow for new connections to equipment on...
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Direct replacement of (2) rooftop hvac single package units onto existing roof curbs.
Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing. No change in use, egress or occupancy under t...
Gas connection to three (3) roof top units.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Structural steel framing for roof dunnage. no change to use, egress or occupancy.
Facade Repairs and Roofing Membrane Replacement. No change in use, egress, or occupancy.
Replacement of roof top unit and associated duct/piping as per plans. no change to use, egress or occupancy.
Facade and roof restoration no changes to use, occupancy or egress.
Herewith filing of structural application for demo work on 1st floor, new framing and add new roof dunage as indicated on plans filed herewith. no change in use, egress or occupancy filed under this a...
Nyu langone - brooklyn augustana 3rd floor rehab - structural modifications including new dunnage to allow for new mechanical equipment on roof. no changes in use, egress, or occupancy.