168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary construction fence for reinforcing support elements at ps 80r, 715 ocean terrace, staten island as indicated on plans. there will be no change in the use,…
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Install indirectly illuminated wall sign (24 hour care)
Install indirectly illuminated wall sign (schwarzman animal medical center)
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Respectfully filing herewith for ST work as per plans. No change to use, egress or occupancy on this application.
Respectfully filing herewith for GC work as per plans. No change to use, egress or occupancy on this application.
Fn/nycha eastchester houses bldg #10 submitting on behalf of contractor for the installation of temporary construction equipment (fence) to protect public from work areas .no chang…
Fn/nycha eastchester houses bldg #6 submitting on behalf of contractor for the installation of temporary construction equipment (fence) to protect public from work areas .no change…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of plywood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
General construction modifications taking place on the Mez, 1st floor, and cellar as per plans filed herewith. No change in use, egress or occupancy
FANATICS FEST NYC 2026: Solomon Group - TOPPS BOOTH #1337 to install a temporary exhibit within an existing exhibition building. Scheduled construction on 07/10 - 07/21, 2026. No c…
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Install storefront awnings with non-illuminated copy reading toby's estate. copy not to exceed 12 sq ft total. no change in use, egress or occupancy
Fn/is217x- for temporary construction equipment (fence)submitting on behalf of contractor, related to dob#x01108281, no change in use, occupancy or egress
Install non-illuminated sign on sign structure filed under separate application (the home depot)
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no changes in use, egress or occupancy in this application.