168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed ST work in conjunction with Alt-CO # B01030356-I1. Work includes new rear addition; partial reconstruction of roof; removal of existing rear wall; alterations to existing…
Roof repairs and parapet modificatins as per drawings. no change in use egress or occupancy is involved under this application.
Replacement of roof membrane and roof insulation.
Replacement of the existing entryway portico assembly including the decking, parapet, roofing and ornament. No structural concrete work. No change to egress of occupancy. No interi…
Replacement of the existing entryway portico assembly including the decking, parapet, roofing and ornament. No structural concrete work. No change to egress of occupancy. No interi…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Filing to legalize HVAC units on the roof. Scope originally approved under #200822761, but never permitted.
Replacement of 3 rooftop units with a total capacity of 30.5 tons. no change to egress, use, or occupancy.
Temporary roof protection at the adjoining properties as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl…
Installation of 300 psf sidewalk shed, overhead protection, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no chan…
Installation of split system on the 2nd floor and roof with a total capacity of 4 tons. no change to egress, use, or occupancy.
New mechanical work type filed to install new hvac roof top units and split units at 1st floor as per plan.no change in use, occupancy or means of egress.
Replacement of the existing entryway portico assembly including the decking, parapet, roofing and ornament. No structural concrete work. No change to egress of occupancy. No interi…
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold from the top of the sidewalk shed and lower roof past the main roof p…
Proposed interior renovation on cellar, 1st thru. roof floor. ceiling, flooring & partition works and replace window and door as per plan. no change in use, bulk, egress or occupan…
Conversion of existing multi family dwelling to two family dwelling. add a stair bulkhead, roof terrace. facade work to modify windows and door openings at rear basement and 1stflo…
Herewith filing for like-to-like replacement of existing damper and/or actuator assembly on the roof as per plans. no change in use, egress or occupancy
Remove illegal roof of deck at rear. remedy to cure dob violations #: 39161194h. no interior work. no change in use, bulk, egress or occupancy.
Masonry rebuilding, waterproofing lining of gutters, drain pipe repair related interior repair as per plans filed herewith. no change to use, egress or occupancy to PK110K.
Modification to existing VERIZON site on the roof. Relocation of 1 sector (4 antennas) and 1 OVP, remove 3 RRHs, replace 6 RRH units, and install 3 GPS antennas on the roof
Provide supplemental dx split heat pump for dispatch room. outdoor unit on roof