17,274 permits matching "roofing"
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroof at rear bay window low roof, no hot works. no work to (e) roof structural sheathing. no work to upper sloped roof.
Convert existing industrial use building to an office building as per plan. new flat roof to be built over existing roof and new stair bulkhead on roof. obtain new certificate of occupancy.
The work is masonry restoration and lintel/spandrel waterproofing at the east facade, and at the at the west mechanical roof level and pump room roof level roofs (for the masonry work at the parapets)...
The work is masonry restoration and lintel/spandrel waterproofing at the east facade, and at the at the west mechanical roof level and pump room roof level roofs (for the masonry work at the parapets)...
Install solar panels on roof of principal building. roof type: sloped (2:12 to 5:12). inverter output: 11.5 kw. array output: 12.3 kw. includes 13.5 kwh energy storage system. location: roof of house....
Convert existing industrial use building to an office building as per plan. new flat roof to be built over existing roof and new stair bulkhead on roof. obtain new certificate of occupancy.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: roof replacement, install 3 ply system new roof, no hot work
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing: flat roof, remove (e) torch down at flat roof & reroof using modified roofing membrane torch down.
re-roofing: remove existing roof mechanically fasten 28 fiberglass base sheet, replace all drip edge metal, fasten all metal with 1-1/4" roofing nails, torch apply 1 layer of flintlastic gta class b f...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing: tpo roof. no hot works. reference roof deck permit pa# 202604179626.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com