13,622 permits · HVAC
Replace boiler and hot water heater and install two new boilers and one new hot water heater. no change in use, egress or occupancy.
Mechanical work filed in conjunction with M01371067-I1.
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one...
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s)and a separate express electrical permit for new pool luminaire is required, when applicable,except for one an...
Filing herewith for installation of grease exhaust duct ( 12 ga black iron ), grease exhaust hood type - i, and makeup air supply system for first floor kitchen: relocate nfpa-96 compliant grease exha...
Mechanical work associated with conversion of building into daycare facility
Install of temp platform, LED screen, scenic walls, no alt to exist structures for Paramount Upfront. A TPA is required. Producer is responsible to monitor site safety. All production equipment remove...
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Interior build-out to existing retail space in type 1a construction building. proposed occupancy class b (barber shop). new interior partitions and existing toilets will remain as is. new plumbing, el...
Mechanical work from the 2nd floor as plans filed herewith. no change in use, egress, or occupancy.
Mechanical Work as shown on plans. No change to use, egress or occupancy.
Herewith filing mechanical work as per plans. no change in use, egress or occupancy
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Modification of ductwork and installation of (2) ac units.
Modification of existing mechanical system to relocate and install new units and ventilation system as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Mechanical work on the 10th floor (Ramboll) as indicated on drawings.
Mechanical Work on 4th and 5th Floor
STRUC/ELEC/PLMB/MECH - COMMERCIAL MISCELLANEOUS - Building
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com