168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Hereby filing to demolish/remove existing mechanical units with associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
Modifications to existing HVAC system & related piping including installation of AC units. No change in use, egress or occupancy.
Installation and use of temporary concrete placing boom as per plans filed herewith. no change in use egress, or occupancy.
Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy.
Filing a PMM application in conjunction with job #B00743602-P2
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Propose a new three story with three family dwelling units. obtain new c of o
Herewith filing mechanical modifications for MSM S&R AHU Replacement Project. No change in use, egress, or occupancy.
Instalation of new ductless air conditioning system instead of wall units in apartment 22c. no change in use, occupancy or egress.
Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli…
Mechanical work as per the plans filed herewith. no change to use, egress or occupancy.
Adding nat gas as primary fuel to existing boiler equipment. no change in means of egress, use group, or occupancy.
Work includes per the filed plans remove/replace cracked/spalled masonry units, masonry repointing, remove/replace steel lintels, scrape/paint existing lintels/columns/dunnage beam…
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Combination of units 2ab and 2c as per tppn#3/97, relocation of interior doors, new laundry room, new bathroom, replacement of existing ac system in 2ab and install new hvac system…
Mechanical systems work as per submitted plans. includes new water source heat pumps, kitchen & bathroom exhaust ductwork. no change in use, occupancy or egress.
Split apartment#d1. scope includes minor demo work, new non-load bearing partitions&fire escape ext. apt. splits of a2, a5, a9, d1 & d6. 80 sq ft. reduction of apts. c7, d7, e2 & e…
NYCHA Sumner BOILER-BLDG #12- Civil work being filed for repair to existing Mechanical room correspondent to the Sumner BL Houses Project.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work in conjunction with New Building Construction.
New Installation of Oil and Gas Boiler as shown on plans