5,433 permits · Roofing · NY
Modification of an existing Verizon site. Replace natural gas service from basement gas meter to generator replacement on roof filed under DOB application no. X00802727-I1. All work in conformance wit...
Rooftop solar installation. no change to use, occupancy or egress.
Excavate to waterproof building foundation wall in limited areas. Concrete curb and paver paving replacement.
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
Replacement of roof top unit and associated duct/piping as per plans. no change to use, egress or occupancy.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
This application is for alt type ii alteration of an existing building comprising a new fireproof fire passage at cellar & 1st fl with new interior & exterior stairs from rear yard leading to street;...
Direct replacement of (2) rooftop hvac single package units onto existing roof curbs.
Herewith filing for Restoration and repairs to facade and roof with bulkheads as per the drawings. No change in use, egress or occupancy.
Interior apartment repair and roof repairs. No change in use, egress or occupancy.
This application is for alt type ii alteration of an existing building comprising a new fireproof fire passage at cellar & 1st fl with new interior & exterior stairs from rear yard leading to street;...
AMVERSEV Garage Parking 8 Staircase repairs as per the plans filed including: Removal/replacement/ repairs to waterproofing membrane, flashing, expansion joints, drains, stone & brick masonry, plaza f...
Roof structural work and roofing replacement.
Remove and replace coping stones, install waterproofing where necessary.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Facade and roof restoration no changes to use, occupancy or egress.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Renovation of the garage, including roof replacement, siding replacement, newskylights, new window and door- no change in occupancy, use or egress
Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in u...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com