17,358 permits matching "roofing"
Installation of (3) air cooled roof top units located on the 2nd floor roof
Spr 2019 cbrc: proposed 3 story/3 unit residence w/ground floor type a unit and roof deck, rear 3 story stair to roof deck, 5' front metal/6' side wood fences, and 2 space parking pad (1 ada), per pla...
Perform minor interior partition demolition & construction inconjunction with conversion to two family dwelling. remove one kitchen, relocate kitchen from 3rd to 1st floor. remove roof hatch & ladder...
Flat Roof - EPDM The roof covering shall meet the requirements of Minnesota Residential Code Section R905.12. Installation shall be in accordance with Chapter 9 and the manufacturer's instructions.
sweep off existing roof material & replace with foam overlay 1100 sq ft. no hot works. crrc 2132 white class b flat roof no resheet.
removal of existing roofing materials down to the existing sheathing, and installation of new class-a malarkey legacy asphalt composition shingles roofing assembly with a manufacturer's limited lifeti...
2500 sq ft re-roof, roof tear off, new underlayment, comp shingle, like for like
Herewith filing to provide relocated and new roof drains and piping at this existing garage roof in conjunction with dob now structural garage repairs application B01300073-I1. No change to use, occup...
Installation of roof protection at neighboring roof (842 5th Ave) during work at 4 E 66 street, as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupan...
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
P.S. 244-q: Replacing Gas fired roof top HVAC units with roof top Electric Heat pump HVAC units.
Self cert 2019 cbc: full building permit for 2 story single family residence with basement, roof access, roof deck, rear deck with pergola, front porch, front & rear balconies on 2nd floor, driveway,...
Herewith filing to provide relocated and new roof drains and piping at this existing garage roof in conjunction with dob now structural garage repairs application B01300073-I1. No change to use, occup...
Installation of roof protection at neighboring roof (842 5th Ave) during work at 4 E 66 street, as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupan...
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Convert (e) laundry, storage & mech room @ 1st floor to (n) leasing office, convert boiler area with lattice roof @ 2nd floor to maintenance office with (n) solid roof. & (n) open to sky boiler area a...
P.S. 244-q: Replacing Gas fired roof top HVAC units with roof top Electric Heat pump HVAC units.
Roof structural work and roofing replacement.
Structural work filed in conjunction with the renovation of one family residence. Framing for enlarged opening at rear wall, for roof skylight and hatch. Roof dunnage.
Installation of roof protection for adjacent property during construction. roof protection shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com