17,358 permits matching "roofing"
Structural work filed in conjunction with the renovation of one family residence. Framing for enlarged opening at rear wall, for roof skylight and hatch. Roof dunnage.
Installation of roof protection for adjacent property protection during construction. roof protection shall comply with 2022 chapter 33 building code. no change in egress, use, or occupancy.
Roof structural work and roofing replacement.
HUB Consultation Accepted. Construction of a 5 Story Educational Structure with Roof and Roof Terraces with Entrance along Division Road. The Design of the Secondary Connection shall be phased and sho...
Installation of roof protection for adjacent property during construction. roof protection shall comply with nycc 2014 chapter 33 . no change in egress, use, or occupancy.
Installation of roof protection for adjacent property protection during construction. roof protection shall comply with 2022 chapter 33 building code. no change in egress, use, or occupancy.
HUB Consultation Accepted. Construction of a 5 Story Educational Structure with Roof and Roof Terraces with Entrance along Division Road. The Design of the Secondary Connection shall be phased and sho...
Roof structural work and roofing replacement.
Repair wall and remove/replace roof rafters and roof impacted by vehicle. replace overhead door. same location locations: 1 residential unit(s), 0 non-residential unit(s), exterior work, garage make r...
Structural work filed in conjunction with the renovation of one family residence. Framing for enlarged opening at rear wall, for roof skylight and hatch. Roof dunnage.
Re-roof flat roof 2020 msbc
flat roof repair partial, plywood, downspout replacement. active leak roof repair with torch down.
horizontal addition -add 43 sf to rear of building. relocate side setback wall and construct new wall. remove partial roof and construct new partial roof. the lighting and receptacles are existing to...
revision 202412197150 to remove office and change family room to gym. expand media rooma dn add wet bar. (n) horizontal addition to include roof deck and entry to hall and laundry room. (n) sprial sta...
New Construction - FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE (ENCLOSED ACCESS STAIRS ONLY). FOR USE AS...
Starr Roof: roof replacement as indicated on plans filed herewith. No change to use, egress or occupancy.
P.S. 244-Q: Proposed roof replacement including access landings, new walk pads on the roof. Modifications of concrete curbs and building perimeter sealant.
Facade repairs to include brick masonry repairs & replacement, lintel repairs & replacement, & main roof and bulkhead roof replacement. no change to use, occupancy oregress.
Starr Roof: Structural Modifications to accommodate the roof replacement project as per plans. No change to use, egress or occupancy.
Starr Roof: Modifications of HVAC equipment and ductwork to accommodate the roof repair project as per plans. no change to use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com