168,746 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
1 door(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required…
Supplemental permit to 25016-20000-24367 to capture MEP fees.
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___10___Squares. Class A roof covering is required within Very High Fire Haz…
2-story addition for 1 adu's and laundry room to existing multi-family building.
Supplemental to permit # 25010-20000-01927 to change contractor - From Owner-Builder to Contractor (ELITE BUILDERS & DESIGN INC )
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Supplemental to 25010-10000-02692. to enlarge garage. revise floor plan.
2025 wildfire, new site retaining wall ,eo1
16 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is requir…
2025 wildfire, site grading for removal and recompaction for rebuild of sfd with attached garage, eo1
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___40___Squares. Class A roof covering is required within Very High Fire Haz…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 26 Squares. Class A roof covering is required within Very Hig…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing (31) Squares. Class A roof covering is required within Very Hi…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 27 Squares. Class A roof covering is required within Very Hig…
EPLAN:Installation of Building Wall SignsB (25.75" X 290.8125")D (39.25" X 152")E (39.25" X 152")F (12" X 18")
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Supplemental to 25010-10000-02581 to alter floor plan, remove bar/ add powder room. Eliminate fireplace from primary bedroom and add an open beam ceiling.
Suppl. permit to 25014-20000-01728. revise plans to replace and combine two sliding doors into one sliding door.
A supplemental to 23014-10000-05024 to update str. inventory to show no new dwelling is added.** no fee - department error**
*eplan* Attn: Quan Nghiem. Under construction Lucas Museum. THE SCOPE INCLUDES REPLACEMENT OF THE PRCASE BENCHES OUTSIDE OF THE MAIN LOBBY OF THE MUSEUM WITH FOUR NEW BOLLARDS.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 22 Squares. Class A roof covering is required within Very Hig…