Search Building Permits
2,835 permits · HVAC · NY
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Oil to gas conversion for heat. Repair gas piping due to a gas shutdown. Install (1) gas water heater and (1) Steam boiler.
Boiler and burner replacement .
Installation of hvac system as per plans filed herewith. no change in use, egress and occupancy.
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Boiler and burner replacement .
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Install new gas piping and gas meter for replacement gas/oil burner on existing low pressure boiler. no change in use, egress or occupancy.
Propose to remove illegal partitions in order to cure violation # 34436691r install fire rated door in boiler room with fire rated enclosure.no change in use, egress, or occupancy.install enclosure fo...
Herewith filing Fuel Oil Storage Removal in cellar. No change in use, egress, or occupancy.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Oil to gas conversion for heat. Repair gas piping due to a gas shutdown. Install (1) gas water heater and (1) Steam boiler.