22,223 permits · Other · NY
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Storage of material / equipment on top of heavy duty sidewalk shed. storage shall not exceed 50 psf. shed filed under separate application. storage shall comply with ch#33 of the nyc bldg code. no cha...
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Removal of one story quonset hut as per plans.
Installation of debris chute as per plan
Install 8'-0 height construction fence as per plan. no change to use, occupancy or egress.
Facade Inspection via Industrial Rope Access
Installation of suspended scaffold for facade work or inspection.
Construct a two-family detached residence with built-in two car garage.
Installation of temorary plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under...
General construction work filed to install a chain-link fence surrounding located within the property line. no change to egress, use or occupancy.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Structural in conjunction with I1 construction filing to include sister basement joints, new footings and columns, new cellar slab, new cellar entrance as per the plans filed herewith
Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
SP work to alter an existing system on floors 2-5, 7 and 8.
Installation of sprinkler/ standpipe system as per plans.
Filing for the installation of construction fence on behalf of contractor
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com