4,950 permits · Roofing · CA
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing (10 ) Squares. Class A roof covering is required within Very High FireHazard Sever...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing _28_Squares. Class A roof covering is required within Very High Fire Hazard Sever...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___20___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VH...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
remodel of sfd,exterior changes to inc:rear addition @ basement level,with new roof deck,rear addition @ 2nd level,(n)stairs & door @ facade,1(e)window replacement.interior to inc:remodel of kitchen(n...
revision to pa #2024-0501-1150: change steel cable railing to glass railing at roof deck
reroof w/hot work.
reroof w/hot work.
reroof w/hot work.
reroof, no hot work.
re-roofing. demo existing roof and install new 60 mil tpo membrane. no torch down.
solar permit: installing 15 solar pv modules, 400 watts per module, total no. of rating 6 kw. mounted: roof, ballasted: n | roof mount pv. 6.00 kw. 15 maxeon 400w panels. 15 iq8a enphase micro inverte...
revision to #202407085951 & 202412126740: replace roof @ dining room & kitchen to align w/ (e) ceiling adjacent to living room & family room ceiling (no additional bldg height per sfpc 260); new parap...
roof top deck repairs, remove and repair in kind, less than 50% repair.
reroof, no hot work. subject to the cool roof program
reroof of roof deck, no hot work. work only at front low roof
solar permit: installing 13 solar pv modules, 405 watts per module, total no. of rating 5.265 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 13.5 vac, with 13.5 kwh each in capac...
reroofing- no hot work. remove(e) asphalt shingle roof, install new underlayment and new 30 year architectural asphalt shingles.
reroofing- hot work
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com