14,177 permits matching "hvac"
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1. No change in use, e...
FOR RESIDENTIAL TENANT: INSTALL NEW COMBI-BOILER IN 2nd FLOOR APARTMENT, REMOVE BOILER AND WATER HEATER IN CELLAR, INSTALL ONE (1) NEW GAS METER AND INSTALL GAS PIPING.
Mechanical work filed in conjunction with Alt-1 application #121206630
Work type filed for replacement of 4 hvac unit roof of building on replacement existing steel dunnage connecting to ex. system and piping. original application #510003407
Installation of mechanical cooling, ventilation and heating system for FDNY Engine Company 159 including kitchen rangehood exhaust system, as shown on plans. No change of use, egress or occupancy unde...
1.install domestic hot water heater system, domestic hot/cold system/piping, sanitary/vent piping, gas piping, and storm drainage system/piping. 2. install new ejector pumps for cellar and new elevato...
Interior Remodel and addition Remodel of existing home and 709 sqft master suite addition remodel area includes kitchen living room dinning room pantry wash room mud room and 1 2nd floor bedroom drive...
Filing herewith drawings to install new exhaust ducts for proposed gas dryers. this application does not require a new or amended certificate of occupancy as there is no change in use, egress or occup...
Site Plan Condo: New construction of a new two-story duplex (3br/2.5ba/unit) with attached garages (1300 Sweet Bark St)
o Enterprise Electrical will furnish and install new specified light fixtures. ¿ Per Sheet E2.01 and E0.03 Luminaire Schedule o Enterprise Electrical will install and program all lighting controls as...
Construct alterations for diagnostic imaging on second floor of existing outpatient clinic (Optum Madison Center) per plan. Mechanical work included this permit.
Interior Remodel- Door replacement that will require new header. Raising interior floor of sunken den area in order to create a level floor. Relocation of windows see elevation drawings. Revised ** 4/...
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
Site Plan Condo: New construction of a new two-story duplex (3br/2.5ba/unit) with attached garages
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
PB: New construction of 2 story SFR condo - attached 2 car garage rear extended covered patio balcony 5 bedrooms 5.5 bathrooms
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton horizontal gas system
New construction of a 2 story single family residence with attached garage and covered porch. 5/4.5 Reference approved PUD: C8 2018-0171.2B.SH
Replacement of complete existing central heat and air system with or without duct work Brett LaBissoniere
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com