171,515 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
SUPPLEMENTAL PERMIT TO 26016-90000-08980 TO UPDATE WORK DESCRIPTION TO READ:Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing…
*eplan* supplemental permit to 25014-10000-01556 to revise the rear setback.
Supplemental to permit # 26016-90000-04016 for change of address - to add Building 1 to the address
Attn: Kevin MoralesThe original plan check number is 24010-10000-00599.We have added a DAS room on the ground floor, and therefore we are requesting a supplemental plan check, incl…
EPLAN REPAIR STOREFRONT OF EXISTING RETAIL DUE TO VEHICLE COLLISION***"COMPLY WITH DEPARTMENT ORDER effective date 09/22/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". CEIS…
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing _5_ squares. For residential roof replacement > 50% of the total roof area,…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __15__Squares. Class A roof covering is required within Very…
3 bathroom(s).Bathroom remodel for residential buildings (no structural changes).1 door(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, l…
Grading excavation for the new pool and spa.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 43 Squares. Class A roof covering is required within Very Hig…
Eplan: supplemental permit to 25047-20000-00181 to revise pool enclosure and drowning prevention features on site plan.
**EplanPROPOSE TEMPORARY SHORING WITH LAGGING & SOLDIER PILES FOR SINGLE FAMILY BASEMENT
Installation of suspended scaffold for facade work or inspection.
ePlan. Demolish 12'x6' double faced offsite sign (takedown credit applied to LA Metro TCN FF-21).Double faced sign with 72-sf panels.OSSPIP Case #297867.originall permit#75la67880
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 59 Squares. Class A roof covering is required within Very Hig…
Beta-max hoist installed in order to lift material to perform facade repairs. sidewalk shed filed under separate application.
Beta-max hoist installed in order to lift material to perform facade repairs. sidewalk shed filed under separate application.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Grading for new single family dwelling and accessory dwelling unit.