14,149 permits matching "hvac"
General-Express-Building Construction:1021/University - UPTOWN : Building, Electrical, Mechanical, and Plumbing permits for the proposed construction of a new attached ADU within an existing multi-dwe...
Rapid Review-Standard-Building Construction:4250/Executive - UNIVERSITY Building, Mechanical, Electrical and Plumbing permits for a tenant improvement on the 4th floor, suite 440 of an existing nine-f...
Rapid Review-Standard-Building Construction:8316/Century Park - KEARNY MESA: Building, electrical, mechanical, and plumbing permits; For the proposed tenant improvements to the existing office. Work t...
General-Express-Building Construction:7425/Mission Valley - MISSION VALLEY. Building, mechanical, electrical & plumbing permits for tenant improvement to remove existing shower & locker rooms & replac...
Renovation of exist. residential house with cap/remove/relocate/replace/new boiler, bathroom, kitchen and plumbing fixtures as per plan. no change in use, egress or occupancy.
Mechanical work for an eating and drinking establishment.
JOB FILED HEREWITH FOR NEW BOILER EQUIPMENT IN THE BASEMENT AS PER PLANS, INCLUDING INSTALLATION OF NEW TANKLESS COMBI HEAT/HWH BOILERs. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Proposed installation of 2.5 ton mini split heat pump system in apartment 1a. no change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith.
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no change in use,...
Mechanical system installation for proposed new residential building as per plans here within. no change to egress, use or occupancy.
Installation of one (1) new gas boiler in conjunction with alteration application# x00913158-i1
Removal of fuel oil storage tank. No change to use, egress, or occupancy.
Register two (2) residential boilers in cellar.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 30 through 33. Construction costs and filing fees included in full-floor Mechanical job # M01293952-S1. No change in use, e...
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 39 through 41. Construction costs and filing fees included in full-floor Mechanical job # M01293994-S1. No change in use, e...
Mechanical work as shown on plans filed herewith, at construction floor 8/marketiing floor 10. no change in use egress or occupancy under this application
Installation of 3 hvac units with a total capacity of 14 tons on the fourth floor and roof. no change to egress, use, or occupancy.
Filing for mechanical work associated with interior demo of 24th & 25th floor offices as per plans submitted herewith. no change to use, egress, or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com