168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Install mechanical ventilation over cooking appliance. no change in use, egress or occupancy
Demolition of ductwork and ac units with associated ductwork, piping, wiring and controls
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
Direct replacement of mechanical units on the 4th floor. no change to use, egress, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Temporary mechanical piping for temporary boiler as per plans filed herewith. no change to use, egress or occupancy
Mechanical work type filed subsequently in conjunction with general construction filing #b01369258-i1
Mechanical updates for audemars piguet as per plans filed herewith
Installation of a temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of a temporary Overhead protection & enclosed system via Scaffold, Fence, and Wire Screen per plan submitted. Work shall comply with 2022 building codes chapter 33. No…
Northwell Lenox Hill: HVAC upgrades for Central Sterile Supply area, as per plans filed herewith.
Interior renovation in cellar, 1st through 3rd floor as per plan. install new ac units. no change in use, egress and occupancy.
Temporary hoist run-back structure during new bldg construction, filed separately. run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or…
Direct replacement of exist. gas fired steam boiler in exist. location in the cellar. vented thru outside air from existing chimney
Filing herewith mechanical/hvac installations, additions, and modifications to MER room Mechanical systems as per plans. No change in use, egress, or occupancy in this application.
Installation and use of betamax hoist to liftdebris/construct. equipment
Replacement of existing ventilating fans, ductwork and cotnrols. replacement of existing window ac unit.
Mechanical work for the renovation to existing unit ph1b as per plans filed herewith. no change to use, egress, or occupancy.
Replace the water damaged mechanical-electrcial parts of the existing automated parking system. all mainframe beams to remain. system originally approved & signed off under applica…
Installation of a temporary overhead protection via sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupan…