168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of Sprinkler and standpipe in conjunction with New Building Job # B01038171-I1
Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.
Interior renovation of existing 1st floor per plan of an existing one family dwelling. work includes new partition, finishes. no change in use, egress or occupancy
Sprinkler/standpipe filed in conjunction with nb # b01248951-i1
Installation of standpipe and sprinkler system in conjunction with nb b00696392-i1
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed four (4) story new build'g w/ bulkhead, six (6) dwelling units, obtain new certificate of occupancy.
To propose one new open (unclosed) canopy at rear yard as per plan filed herewith. no change of use, egress or certificate of occupancy.
General construction, new non-bearing partitions as per plans herewith filed.
New 3 story 2-family building
New 4 story and cellar residential building.
New lot line protected opening in existing cmu wall on groundfloor to be completed along with new vestibule and door.
Proposed new mixed use community facility and commercial 4 story building.
Filing only for demo of existing interior partitions/doors at cellar-001 as per plan.no change to use egress or occupancy. GC, MH,PL,SP for design to be filed separately All in con…
Foundation and earthwork filed in conjunction with nb job number m01142990-i1.
Selective interior renovation of existing apartment 7-11 (6th syory); including new partition and door and minor change of appliances in kitchen. no exterior work, no change to egr…
Support of excavation filed in conjunction with nb job number q01283772-i1.
1) Erect new detached garage. 2) Obtain new CO.
To errect support scaffold for construction of new building.
Construction of a new, nine (9) story mixed-use building.
Construction fence as per drawings during nb construction filed sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…