16,228 permits · Roofing
Self-cert 2019 cbrc: cps school, no change in use. re-roofing of an existing 3 story cps elementary school with select exterior masonry repair. miscellaneous interior repair resulting from roof work....
Installation of steel dunnage for installation of new heat pump unit at the main roof as per plans filed herewith. No change to use, egress, or occupancy.
Parapet replacement cracked & spalled brick replacement waterproof stone panels cut & point brick & stone mortar joints embedded iron & steel fastener removal remove & replace deteriorated steel linte...
Self-cert 2019 cbrc: interior gut remodel of the existing 2-story, type iiia masonry, 23' ht., 4-unit residential building with basement including basement dig-down, new roof deck for existing type ii...
Installation of 41.965 kw solar energy system on roof. No change of occupancy, use or egress.
Scope of work alteration type 2herewith filing to remove existingroof framing to raise height of roofsurface to add a additional 7'-0 inheight. filing for the construction ofa framed roof bulkhead.no...
Amendment to proposed structural & foundation scope of work. Amendments include reduction in structural dunnage on roof, reduction of exterior footings, columns and beams. No change in use, egress or...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 24 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Installation of 85.02 kw solar energy system on roof. No change of occupancy, use or egress
Installation of solar panels on roof. no change in use, egress, or occupancy.
Installation of 80.66 kw solar energy system on roof. No change of occupancy, use or egress
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
General construction for exterior roof & facade repairs as per plans filed herewith. no change in use, egress or occupancy.
Installation of 80.115 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 84.8 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 40.67 kw solar energy system on roof. No change of occupancy, use or egress.
P.S. 39-R: Storm: Removal and replacement of roof drain and existing areaway drains. Flow test of all storm drains and piping. Installation of new sump pump in cellar.
Installation of 68.67 kw solar energy system on roof. No change of occupancy, use or egress
Installation of 74.12 kw solar energy system on roof. No change of occupancy, use or egress.
Exterior Renovations to existing Multi-Family building including overcladding with exterior insulation finish system (EIFS) on lower Level and Floors 1-20, Roof. No other work is proposed. There is no...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com