168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Extend masonry chimney and install new liner. no change to use, occupancy or egress
Application 1. First generation interior tenant office space. Includes typical private offices open office workstations conference rooms. Breakroom is
Replacement of complete existing central heat and air system with or without duct work hvac change out
Whole home interior remodel - no major structural changes upgrades upgraded kitchen and bathrooms and adding a powder bath. New HVAC unit. New floors
Replacement of complete existing central heat and air system with or without duct work
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior remodel to existing office suite. Existing law office is taking over additional space from adjacent suite 270 which will be fully consumed by
New 2.5-story single family residence with 4 bedrooms 3.5 bathrooms and an attached 2-car garage
Connect New Mobile Home w/ Decks (4x4 front & back)
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System and Repair Or Rebuild Of
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: replace existing 3-ton split system (air condit
Bldg 2: new two-story SFRs (3br/2.5ba) with attached garages and covered patios
Connect New Mobile Home w/ Decks (4x4 front & back)
Bldg 1: new two-story SFRs (3br/2.5ba) with attached garages and covered patios
Replacement of complete existing central heat and air system with or without duct work Mark Marshall
Mechanical scope associated with the renovation of the existing Safe Area at Public Theater. No change of use, egress or occupancy.
Installation of ductless mini split system for heating and cooling as per plans filed herewith . no change in use egress or occupancy
Boiler replacement as per plans filed herewith. no change in use, egress, or occupancy.
Boiler replacement as per plans filed herewith. no change in use, egress, or occupancy.
Install (4) kitchen hood as per plan. no change in use, egress, or occupancy under this filing.
Installation of new ductwork, air devices, controls to serve existing chilled water fan coil units. Installation of new exhaust fan above tenant restrooms. For Space 0137 - Gap Fac…