168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Abandon two (2) existing buried fuel oil storage tanks as per plans. no change in use, egress or occupancy.
Replacement of existing ventilating fans, ductwork and cotnrols. replacement of existing window ac unit.
Proposed mechanical work to apartment #11c, replacement of air conditioning system with new split unit a/c handling units, ductwork, and air distribution system.
Install mechanical ventilation over cooking appliance. no change in use, egress or occupancy
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Mechanical work on the cellar level, (Kenton Hall) as indicated on drawings
Install Air Handling units for heating and cooling systems w/ Compressors in the Rear Yard. No change in use, occupancy, egress or floor area.
Mechanical modifications taking place on the ___6 & 7_ floor as per plans filed herewith. No change in use, egress or occupancy
Installation of Fuel Storage tank for a diesel-based emergency generator.
Replacement of existing ventilating fans, ductwork and cotnrols. replacement of existing window ac unit
Hvac work for mixed residential & commercial building. no change in use, occupancy and structure under this application
Suspended scaffold in order to perform exterior facade repairs and periodic inspections. Inspections to be conducted by EOR. Sidewalk shed filed under separate application. No chan…
Installation of hvac system in existing two family house. no change in use, bulk occupancy or egress.
Installation of temporary protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Install kitchen exhaust and make up air systems
Mechanical changes as indicated on plans.
New Installation of Oil and Gas Boiler as shown on plans
Installation of overhead protection and shoring as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this applicat…
Northwell Lenox Hill: HVAC upgrades for Central Sterile Supply area, as per plans filed herewith.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.