168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Applicaiton filed for temporary construction fence in conjunction with NB X01131311-I1
Installation of standpipe and sprinkler system in conjunction with nb b00696392-i1
Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.
New lot line protected opening in existing cmu wall on groundfloor to be completed along with new vestibule and door.
Sprinkler & Standpipe herewith filed in conjunction with NB job number B01263086-I1
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Proposed vertical enlargement of an existing detached single-family residence. obtain a new certificate of occupancy.
Sprinkler/standpipe filed in conjunction with nb # b01248951-i1
Structural filed in conjunction with nb # b01287567-i1
Install new sprinkler and plumbing system for new building in conjunction with nb job#421681004. no change in use,egress and occupancy.
Alt-1 filed to convert existing 1-family to a 2-family dwelling and obtain a new certificate of occupancy
New two car masonry garage in conjunction with nb gar# q01351901 & alt1# q01330537.
Alt-1 filed to convert existing 1-family to a 2-family dwelling and obtain a new certificate of occupancy
General construction work to include removal of existing non-structural wood frame 1 story addition. repair interior finishes in areas affected. install new energy efficient doors…
Front Stood renovations, stood bricks, limestone thread, canopy and metal railings replacement with new ones as per plans. No Change to Existing Occupancy Use or Egress.
Application filed herewith to erect a new five story residential buidling with sixty-four dwelling units
Install concrete footings for proposed new steel posts supporting interior bearing walls above the 1st floor. lower existing cellar floor by approximately 2'-0.
Installation of 8' high temporary construction fence around job site in conjunction with new building application
New two car masonry garage in conjunction with nb gar# q01351901 & alt1# q01330537.
Temporary suspended scaffold as per drawings during nb const. filed sep. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this…
Foundation filed in conjunction with NB B01268437 -I1